Microwave & TI RAN Roll Out

Preparation

    1. Provide WAH Certificate who work at height
    2. Site Survey & Reporting
    3. Prepare BoQ
    4. Get the Installation Plan (Drawing, Link Budget, Etc.)

Implementation

    1. Apply application software such as Net Gear, NDPD, BORN, Etc.
    2. Installation of Equipment as Planned(New Site, Upgrade, Swap, or Reroute)
    3. Commissioning the Equipment
    4. Reporting and Acceptance

Monitoring Post Implementation

    1. Re-commissioning or re-check for the un-standard result