Traffic Migration

What is Traffic Migration?

Traffic Migration to enable your communication system’s speed to higher level. Moving traffic is disignated from one or more versions to a single new version with benefits. This role is to provide wide range of communication and speed through Fiber Optic Network

How to Move the Traffic?

  • Physically

Install the cables or Laying the FO Patchcord to the Metro-E rack, Do the functionality test (looping test)

  • Logically

The traffic of  all systems in the BTS (2G, 3G, and 4G ) are to be migrated to new transmission line ( Fiber optic)

Preparation Phase

    1. Permit and Key
    2. Network Design (LLD, Transmission Topology)
    3. Technical Site Survey to the implementation

Implementation Phase

    1. Installation of switch or Router components to the
    2. Commissioning the system
    3. Integration the system to Metro-E the network

Post Implementation

    1. Stability Test and monitoring
    2. Documentation and Acceptance

Metro-E Roll Out

Preparation Phase

    1. Permit and Key
    2. Network Design and Topology (LLD,
    3. Technical Site Survey to the implementation

Implementation Phase

    1. Installation of switch or Router components to the
    2. Commissioning the system
    3. Integration the system to Metro-E the network

Post Implementation

    1. Stability Test and monitoring
    2. Documentation and Acceptance